Bexar County (unincorporated), TX zoning: where a drive-thru restaurant is allowed
Is a drive-thru allowed in Bexar County (unincorporated), TX?
We have not confirmed any zoning district in Bexar County (unincorporated), TX where a drive-thru restaurant is allowed by right.
Drive-thru rules in plain words
Bexar County has no zoning in unincorporated areas, so no county use table restricts restaurants or drive-thrus by district. The county FAQ says other development rules still apply. I read no county rule specific to drive-thru lanes, stacking or parking. Platting, floodplain/storm water, Fire Marshal and on-site sewer approvals still apply to commercial sites.
Code facts
- Jurisdiction
- Bexar County, Texas (unincorporated areas)
- Zoning code
- Bexar County subdivision platting (Texas Local Government Code Chapter 232); no county zoning code
- Restaurant parking
- NOT CONFIRMED: no county parking standard was read.
- Drive-thru stacking
- NOT CONFIRMED: no county drive-thru stacking standard was read.
- Signs
- NOT CONFIRMED for the county. The Building Permits page says tree, irrigation and signage permits come from the city whose extraterritorial jurisdiction the property falls within, not from the county.
- Typical approval time
- NOT CONFIRMED: the platting page gives no review timelines. The Building Permits page says Site Development and/or Floodplain Development permits should be filed at least 45 days before the Permit Verification Form.
- Official code
- bexar.org
- Planning office
- Bexar County Public Works Department, Development Services Division (1948 Probandt St., San Antonio, TX 78214) 210-335-6700 bexar.org
Approvals and how long they take
| Approval | Who decides | Steps | Typical time | Fee | Section |
|---|---|---|---|---|---|
| Subdivision plat (required when a property or lot is divided into 2 or more parts) | Bexar County Commissioners Court or Executive Director of Infrastructure Services (per the county page); which one handles a given plat is not stated | Plat must be reviewed by the local government entity and approved; signed and sealed by a licensed professional engineer and a licensed surveyor. Plat Review Process PDF is linked from the county page but was not read. | NOT CONFIRMED | Subdivision Plat Application and Fees document exists; amounts not read | Texas Local Government Code Chapter 232 (as cited by the county page) source |
| Building Permit Authorization / Permit Verification Form from Public Works (needed before the Fire Marshal issues a building permit; for unplatted property an Authorization to Issue Permit form goes to the Fire Marshal) | Bexar County Public Works Department | The FAQ says a Building Permit Authorization (BPA) must be obtained from Public Works before a building permit; the Building Permits page calls the document the Permit Verification Form, which has no fee and needs a project narrative, site plan and CPS Address Verification Letter. If the property is unplatted, Public Works completes an Authorization to Issue Permit form for the Fire Marshal. | NOT CONFIRMED | No fee for the Permit Verification Form (per Building Permits page) | NOT CONFIRMED source |
| Building permit (non-single-family structures: site clearing, constructing, renovating or changing occupancy) | Bexar County Fire Marshal's Office | Submit the building permit application after Public Works authorization; the Fire Marshal decides when a permit is required for non-single-family structures. Page lists no street address. | NOT CONFIRMED (fee and review time per permit are on page 2 of the Permit Verification Guidelines, not read) | Based on an escalating fee schedule approved by the Commissioners Court, with minimum construction cost computed at $25 per square foot; contact the Fire Code Section for the exact amount. Fees are non-refundable (per county FAQ). | NOT CONFIRMED source |
| Site Development (storm water) permit and/or Floodplain Development permit (for work near the 1% annual-chance floodplain; a PE flood study may be required) | Bexar County Public Works Department | Public Works must review all construction activities on property in proximity to the 100-year floodplain. File at least 45 days before the Permit Verification Form. | 45 days before Permit Verification Form (per Building Permits page) | $50 per activity (floodplain development permit) | NOT CONFIRMED source |
| On-site sewer system permit (if no public sewer is available) | Bexar County Public Works, Environmental Services (On-Site Sewage Facilities, per Public Works page) | County FAQ says an On-Site Sewer System permit may be required if no developed sewer system is available. Program details were not read. | NOT CONFIRMED | NOT CONFIRMED | NOT CONFIRMED source |
| Fire Marshal review (fire safety for commercial buildings) | Bexar County Fire Marshal's Office (210-335-0300 per Building Permits page) | Reviews building permit applications for unincorporated non-single-family structures; uses the Public Works authorization form for unplatted property. | NOT CONFIRMED | NOT CONFIRMED | NOT CONFIRMED source |
| Right-of-way permit | Bexar County Public Works Department | The county page lists a Right-of-Way Permits link but no details were read. | NOT CONFIRMED | NOT CONFIRMED | NOT CONFIRMED source |
Overlays to watch
- 100-year floodplain review: Public Works must review construction activities near the 100-year floodplain; a PE flood study may be required; $50 per activity fee. source
Second check against the source text: 2026-11-19 (Official statement 'In the unincorporated areas of the County (any area not within a municipal city limits) there are no zoning regulations.' confirmed word for word on the cited FAQ page; Planning-Zoning page also says Development Services does not handle zoning outside incorporated cities. Corrected: Fire Marshal street address removed (not on cited page); '2021 Fee Schedule' claim removed and replaced with the fee basis actually stated; permit verification entry re-sourced to Building Permits page and BPA naming added; plat entry no longer claims Public Works review; sewer/fire marshal wording tied to pages. Removed the unreopened Permits-Applications source. ArcGIS 27-service list and Chapter 231 Subchapter D (Navy/Coast Guard only) confirmed. Floodplain $50 fee, planning office name/phone/address confirmed. No specific properties or deals found. No county zoning layer or districts exist.).
Drive-thru restaurant rule by zoning district
| District | Drive-thru restaurant | What the code says | Section | Source | Read on |
|---|
"By right" means permitted with site plan and building permit review only. Overlay districts, planned developments (PD/PUD) and conditions attached to a past rezoning can change the answer for a single parcel.
Zoning map
No public GIS zoning layer found. NO COUNTY ZONING: Bexar County's FAQ on zoning says: "In the unincorporated areas of the County (any area not within a municipal city limits) there are no zoning regulations." Source: https://www.bexar.org/m/faq?cat=31%2C (question: "How is my property zoned in the County?", read 2026-11-19). Districts are therefore empty. Other county development rules still apply (platting, floodplain/storm water, Fire Marshal, on-site sewer), listed under profile.approvals. Layer search: the county ArcGIS server at https://maps.bexar.org/arcgis/rest/services lists 27 MapServer services (AlamoColleges_BOT, CensusBlockGroups, CensusBlocks, CensusTracts, CityCouncilDistricts, CommissionerPrecincts, Constables, CountyBoundary, Dashboard, JusticeofthePeace, Libraries, LocalJurisdictions, MapscoPageGrid, Military_Installations, Neighborhoods, Parcels, Parks_County, ParksLocations, Parks, Railroads, SchoolDistricts, Schools, TX_SBOE_Districts, TXHouseRepDistricts, TXSenateDistrictsBexar, USCongressDistricts, ZIPCodes); none is a zoning or land use layer. A public county zoning layer was not found. San Antonio city zoning is a separate layer and does not apply here. The Military_Installations service exists but is not a zoning layer, and no county military overlay was read. Texas Local Government Code Chapter 231 (2009 Justia compilation, may be outdated) has a military-zone subchapter (D) that applies to areas around a U.S. Navy or Coast Guard establishment only, not Army or Air Force installations; this is a reading of that text, not a county rule.
How to confirm before you buy
- Look up the parcel on the official zoning map to get its district and any overlay.
- Open the code section linked in the table and read the use table and the drive-thru standards.
- Call the planning office and ask whether a drive-thru restaurant needs anything beyond site plan review at that address.
Why this library exists
I'm Luke Smith. I find land for drive-thru brands like 7 Brew, Ellianos Coffee and Starbucks, sign the tenant, build the shop and sell it as a net lease property. Every deal starts with the same question: is the use allowed here without a rezoning? Getting that answer takes too long, so we read the codes (with AI research help), and I publish what we find with a link back to every source so you can check it yourself.
If you have a site that fits a drive-thru, or you want to learn how these deals are put together, join the free Reverse Deal Finder community on Skool, see cap rates and land prices by brand, or call 1-760-392-1525. Brokers welcome: I pay commissions.
