{
 "jurisdiction": "Bexar County (unincorporated), TX",
 "state": "TX",
 "counties": [
  "Bexar"
 ],
 "url": "https://ruralvacantland.com/zoning/tx/bexar-county/",
 "publisher": "Rural Vacant Land (ruralvacantland.com)",
 "use": "drive-thru restaurant",
 "last_read": "",
 "summary": "We have not confirmed any zoning district in Bexar County (unincorporated), TX where a drive-thru restaurant is allowed by right.",
 "status_meaning": {
  "by_right": "Allowed by right",
  "conditional": "Needs a conditional or special use approval",
  "prohibited": "Not allowed",
  "unclear": "Not confirmed yet"
 },
 "zoning_layer": {
  "url": "",
  "district_field": ""
 },
 "districts": [],
 "profile": {
  "official_name": "Bexar County, Texas (unincorporated areas)",
  "code_title": "Bexar County subdivision platting (Texas Local Government Code Chapter 232); no county zoning code",
  "official_code_url": "https://www.bexar.org/3270/Subdivision-Platting",
  "zoning_map_url": "",
  "planning_office": {
   "name": "Bexar County Public Works Department, Development Services Division (1948 Probandt St., San Antonio, TX 78214)",
   "phone": "210-335-6700",
   "url": "https://www.bexar.org/1380/Public-Works-Department"
  },
  "drive_thru_summary": "Bexar County has no zoning in unincorporated areas, so no county use table restricts restaurants or drive-thrus by district. The county FAQ says other development rules still apply. I read no county rule specific to drive-thru lanes, stacking or parking. Platting, floodplain/storm water, Fire Marshal and on-site sewer approvals still apply to commercial sites.",
  "drive_thru_stacking": "NOT CONFIRMED: no county drive-thru stacking standard was read.",
  "parking_restaurant": "NOT CONFIRMED: no county parking standard was read.",
  "signs": "NOT CONFIRMED for the county. The Building Permits page says tree, irrigation and signage permits come from the city whose extraterritorial jurisdiction the property falls within, not from the county.",
  "typical_timeline": "NOT CONFIRMED: the platting page gives no review timelines. The Building Permits page says Site Development and/or Floodplain Development permits should be filed at least 45 days before the Permit Verification Form.",
  "approvals": [
   {
    "type": "Subdivision plat (required when a property or lot is divided into 2 or more parts)",
    "who_decides": "Bexar County Commissioners Court or Executive Director of Infrastructure Services (per the county page); which one handles a given plat is not stated",
    "steps": "Plat must be reviewed by the local government entity and approved; signed and sealed by a licensed professional engineer and a licensed surveyor. Plat Review Process PDF is linked from the county page but was not read.",
    "typical_time": "NOT CONFIRMED",
    "fee": "Subdivision Plat Application and Fees document exists; amounts not read",
    "section": "Texas Local Government Code Chapter 232 (as cited by the county page)",
    "source_url": "https://www.bexar.org/3270/Subdivision-Platting"
   },
   {
    "type": "Building Permit Authorization / Permit Verification Form from Public Works (needed before the Fire Marshal issues a building permit; for unplatted property an Authorization to Issue Permit form goes to the Fire Marshal)",
    "who_decides": "Bexar County Public Works Department",
    "steps": "The FAQ says a Building Permit Authorization (BPA) must be obtained from Public Works before a building permit; the Building Permits page calls the document the Permit Verification Form, which has no fee and needs a project narrative, site plan and CPS Address Verification Letter. If the property is unplatted, Public Works completes an Authorization to Issue Permit form for the Fire Marshal.",
    "typical_time": "NOT CONFIRMED",
    "fee": "No fee for the Permit Verification Form (per Building Permits page)",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/1463/Building-Permits"
   },
   {
    "type": "Building permit (non-single-family structures: site clearing, constructing, renovating or changing occupancy)",
    "who_decides": "Bexar County Fire Marshal's Office",
    "steps": "Submit the building permit application after Public Works authorization; the Fire Marshal decides when a permit is required for non-single-family structures. Page lists no street address.",
    "typical_time": "NOT CONFIRMED (fee and review time per permit are on page 2 of the Permit Verification Guidelines, not read)",
    "fee": "Based on an escalating fee schedule approved by the Commissioners Court, with minimum construction cost computed at $25 per square foot; contact the Fire Code Section for the exact amount. Fees are non-refundable (per county FAQ).",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/m/faq?cat=31%2C"
   },
   {
    "type": "Site Development (storm water) permit and/or Floodplain Development permit (for work near the 1% annual-chance floodplain; a PE flood study may be required)",
    "who_decides": "Bexar County Public Works Department",
    "steps": "Public Works must review all construction activities on property in proximity to the 100-year floodplain. File at least 45 days before the Permit Verification Form.",
    "typical_time": "45 days before Permit Verification Form (per Building Permits page)",
    "fee": "$50 per activity (floodplain development permit)",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/1492/Floodplain-Development-Permits"
   },
   {
    "type": "On-site sewer system permit (if no public sewer is available)",
    "who_decides": "Bexar County Public Works, Environmental Services (On-Site Sewage Facilities, per Public Works page)",
    "steps": "County FAQ says an On-Site Sewer System permit may be required if no developed sewer system is available. Program details were not read.",
    "typical_time": "NOT CONFIRMED",
    "fee": "NOT CONFIRMED",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/m/faq?cat=31%2C"
   },
   {
    "type": "Fire Marshal review (fire safety for commercial buildings)",
    "who_decides": "Bexar County Fire Marshal's Office (210-335-0300 per Building Permits page)",
    "steps": "Reviews building permit applications for unincorporated non-single-family structures; uses the Public Works authorization form for unplatted property.",
    "typical_time": "NOT CONFIRMED",
    "fee": "NOT CONFIRMED",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/1463/Building-Permits"
   },
   {
    "type": "Right-of-way permit",
    "who_decides": "Bexar County Public Works Department",
    "steps": "The county page lists a Right-of-Way Permits link but no details were read.",
    "typical_time": "NOT CONFIRMED",
    "fee": "NOT CONFIRMED",
    "section": "NOT CONFIRMED",
    "source_url": "https://www.bexar.org/1380/Public-Works-Department"
   }
  ],
  "districts": {},
  "overlays": [
   {
    "name": "100-year floodplain review",
    "effect": "Public Works must review construction activities near the 100-year floodplain; a PE flood study may be required; $50 per activity fee.",
    "source_url": "https://www.bexar.org/1492/Floodplain-Development-Permits"
   }
  ],
  "sources": [
   {
    "title": "Bexar County FAQ: How is my property zoned in the County? (no zoning in unincorporated areas)",
    "url": "https://www.bexar.org/m/faq?cat=31%2C",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County Planning & Zoning (Development Services functions)",
    "url": "https://www.bexar.org/1670/Planning-Zoning",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County Subdivision Platting",
    "url": "https://www.bexar.org/3270/Subdivision-Platting",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County Building Permits",
    "url": "https://www.bexar.org/1463/Building-Permits",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County Floodplain Development Permits",
    "url": "https://www.bexar.org/1492/Floodplain-Development-Permits",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County Public Works Department",
    "url": "https://www.bexar.org/1380/Public-Works-Department",
    "read_on": "2026-11-19"
   },
   {
    "title": "Texas Local Government Code Chapter 231 (2009 compilation, Justia; section list only)",
    "url": "https://law.justia.com/codes/texas/2009/local-government-code/title-7-regulation-of-land-use-structures-businesses-and-related-activities/chapter-231-county-zoning-authority/",
    "read_on": "2026-11-19"
   },
   {
    "title": "Bexar County ArcGIS REST services directory",
    "url": "https://maps.bexar.org/arcgis/rest/services?f=pjson",
    "read_on": "2026-11-19"
   }
  ],
  "verified": {
   "on": "2026-11-19",
   "by": "sonnet",
   "checked": 16,
   "corrected": 5,
   "notes": "Official statement 'In the unincorporated areas of the County (any area not within a municipal city limits) there are no zoning regulations.' confirmed word for word on the cited FAQ page; Planning-Zoning page also says Development Services does not handle zoning outside incorporated cities. Corrected: Fire Marshal street address removed (not on cited page); '2021 Fee Schedule' claim removed and replaced with the fee basis actually stated; permit verification entry re-sourced to Building Permits page and BPA naming added; plat entry no longer claims Public Works review; sewer/fire marshal wording tied to pages. Removed the unreopened Permits-Applications source. ArcGIS 27-service list and Chapter 231 Subchapter D (Navy/Coast Guard only) confirmed. Floodplain $50 fee, planning office name/phone/address confirmed. No specific properties or deals found. No county zoning layer or districts exist."
  }
 },
 "fees": null,
 "note": "Summary of the public zoning code with links to each source. Not legal advice; confirm with the planning office."
}