 "jurisdiction": "Fort Bend County (unincorporated), TX",
 "state": "TX",
 "counties": [
  "Fort Bend"
 ],
 "url": "https://ruralvacantland.com/zoning/tx/fort-bend-county/",
 "publisher": "Rural Vacant Land (ruralvacantland.com)",
 "use": "drive-thru restaurant",
 "last_read": "2026-11-22",
 "summary": "We have not confirmed any zoning district in Fort Bend County (unincorporated), TX where a drive-thru restaurant is allowed by right. 1 district is not confirmed yet.",
 "status_meaning": {
  "by_right": "Allowed by right",
  "conditional": "Needs a conditional or special use approval",
  "prohibited": "Not allowed",
  "unclear": "Not confirmed yet"
 },
 "zoning_layer": {
  "url": "",
  "district_field": ""
 },
 "districts": [
  {
   "district": "NO ZONING",
   "name": "No zoning ordinance in this jurisdiction",
   "status": "unclear",
   "quote": "",
   "code_section": "n/a (no zoning ordinance adopted)",
   "conditions": "",
   "source_url": "https://fortbendcountytx.gov/government/departments/engineering/building-codes-zoning",
   "read_on": "2026-11-22"
  }
 ],
 "profile": {
  "official_name": "Fort Bend County, Texas (unincorporated areas)",
  "code_title": "None. Fort Bend County has not adopted a zoning ordinance.",
  "official_code_url": "",
  "code_last_amended": "",
  "zoning_map_url": "",
  "planning_office": {
   "name": "Fort Bend County Engineering Department",
   "phone": "281-342-3411",
   "url": "https://fortbendcountytx.gov/government/departments/engineering/development"
  },
  "drive_thru_summary": "Fort Bend County has no zoning ordinance, so the county does not decide whether a drive-thru restaurant may locate on an unincorporated parcel. The county requires a Commercial Development Permit for all commercial development and a driveway permit for driveways onto public roads, after the County Engineer approves civil construction drawings. Use limits, if any, come from deed restrictions, special districts or a city's ETJ.",
  "drive_thru_stacking": "No county stacking or queuing standard was found in the pages read. Every driveway application must include a traffic control plan.",
  "parking_restaurant": "No county parking standard for restaurants was found in the materials read, because the county has no zoning code.",
  "signs": "Signing work needs a county Development Permit (per the permit page). No sign size or setback standards were read.",
  "typical_timeline": "Commercial Development Permit: the county's procedure says processing takes 7-10 business days. Civil plans must be approved first (no time stated). Permits with a driveway need Commissioners Court action, timed to the next available court date.",
  "approvals": [
   {
    "type": "County Engineer approval of civil construction plans",
    "who_decides": "Fort Bend County Engineering Department (County Engineer)",
    "steps": "Per the permit page, the County Engineer must first review and approve a set of civil construction drawings. Submission instructions are on the Engineering Plans page (not opened).",
    "typical_time": "Not stated on the county pages read.",
    "fee": "Civil plan review fee not read (the Plans page covers it, not opened).",
    "section": "Development Permits page (no section number)",
    "source_url": "https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit"
   },
   {
    "type": "Commercial Development Permit (with or without driveway)",
    "who_decides": "Fort Bend County Engineering Department (permitting through the MyGovernmentOnline portal); Commissioners Court acts on permits with a driveway.",
    "steps": "Get signed civil plans. Create or log into a MyGovernmentOnline.org account. Choose Commercial Development Permit with Driveway (driveways onto a public road) or Commercial Development Permit (private or internal driveways only). Upload signed plans plus the recorded plat if platted, or a survey (if not in the plans) and deed if unplatted. Deliver an original hardcopy performance bond of $5,000 per driveway onto a public road. Print the emailed permit and keep it on site.",
    "typical_time": "Allow 7-10 business days to process the permit. Driveway approval depends on the next Commissioners Court date.",
    "fee": "Development Permit $100; in floodplain $150; unplatted (including interior build-outs) $250; excludes other agencies' fees. Fee schedule effective October 1, 2022 (development permit page; the procedure PDF lists no amount).",
    "section": "Commercial Permitting Procedure (county document, no code section)",
    "source_url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/permits/CommercialPermittingProced.pdf ; fees: https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit"
   },
   {
    "type": "Development permit scope (what needs a permit)",
    "who_decides": "Fort Bend County Engineering Department",
    "steps": "Covers re-grading, drainage modifications, on-site sewage facilities, water wells, signing, land-use changes, new buildings, building modifications and work in the 100-year floodplain. Commercial Development Permit is required for all commercial development.",
    "typical_time": "See Commercial Development Permit.",
    "fee": "See Commercial Development Permit.",
    "section": "Development Permits page (no code section)",
    "source_url": "https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit"
   },
   {
    "type": "Driveway permit and turn lane / median opening permit",
    "who_decides": "Fort Bend County Engineering Department; Commissioners Court acts on driveway permits (per the commercial procedure).",
    "steps": "Every application must include a traffic control plan. Performance bond $5,000 per driveway and $65,000 per turn lane; a cashier's check with W-9 can substitute; perpetual blanket bonds cover several projects in unincorporated Fort Bend County with a $50,000 minimum. An internally proposed driveway within a new subdivision needs no permit.",
    "typical_time": "Commissioners Court action on the next available court date (commercial procedure).",
    "fee": "Commercial driveway $550 each; turn or decel lane $1,100 each (driveway PDF). Additional inspections $165 each (development permit page).",
    "section": "Driveway and Turn Lane Requirements (county document, no code section)",
    "source_url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/right-way-permits/DrivewayTurnLaneRequirements.pdf ; inspections: https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit"
   },
   {
    "type": "Plat (subdivision or division of a larger tract)",
    "who_decides": "Not stated in the section read; the text describes plat requirements and exceptions only.",
    "steps": "Section 2.1: a landowner outside city limits must prepare a plat to divide a tract into two or more parts for lots or public-use areas, including by metes and bounds or contract for deed; a plat is always required when a parent tract is divided into daughter tracts for sale under a unified development plan. Section 2.2 exceptions include land used mainly for agriculture, four or fewer lots to relatives, and all lots over 10 acres. Drainage follows the County Drainage Criteria Manual (2.13); roads follow the Design Standards and Details (2.14).",
    "typical_time": "Not stated in the section read.",
    "fee": "Not read.",
    "section": "Regulations for Subdivisions, Sections 2.1, 2.2, 2.13, 2.14",
    "source_url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/regulations-subdivisions/Section2GeneralPolicy.pdf"
   },
   {
    "type": "Address verification letter and Fire Marshal certificate of compliance",
    "who_decides": "CenterPoint Addressing issues address verification letters; the county Fire Marshal's Office issues certificates of compliance.",
    "steps": "New structures need an address verification letter from CenterPoint Addressing (required since January 1, 2022, per the permit page). The Fire Marshal issues certificates of compliance for certain multi-family and non-residential developments.",
    "typical_time": "Not stated.",
    "fee": "Address verification and power release $25 (development permit page). Fire Marshal fee not read.",
    "section": "County Fire Code (not opened)",
    "source_url": "https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit ; https://fortbendcountytx.gov/government/departments/engineering/building-codes-zoning"
   }
  ],
  "districts": {},
  "overlays": [],
  "sources": [
   {
    "title": "Fort Bend County Engineering: Building Codes and Zoning",
    "url": "https://fortbendcountytx.gov/government/departments/engineering/building-codes-zoning",
    "read_on": "2026-11-22"
   },
   {
    "title": "Fort Bend County Engineering zoning verification letter, January 1, 2026 (newest linked)",
    "url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/Zoning-letter_2026.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "Fort Bend County Engineering verification letter, January 1, 2022 (older)",
    "url": "https://fortbendcountytx.gov/sites/default/files/2022-04/Zoning-letter_20220101.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "Development Permit page",
    "url": "https://www.fortbendcountytx.gov/government/departments/county-services/engineering/permits/development-permit",
    "read_on": "2026-11-22"
   },
   {
    "title": "Commercial Permitting Procedure (PDF)",
    "url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/permits/CommercialPermittingProced.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "Driveway and Turn Lane Requirements (PDF)",
    "url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/right-way-permits/DrivewayTurnLaneRequirements.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "Regulations for Subdivisions, Section 2 General Policy (PDF)",
    "url": "https://www.fortbendcountytx.gov/sites/default/files/document-central/document-central/engineering-documents/regulations-subdivisions/Section2GeneralPolicy.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "Engineering Development page",
    "url": "https://fortbendcountytx.gov/government/departments/engineering/development",
    "read_on": "2026-11-22"
   }
  ],
  "verified": {
   "on": "2026-11-22",
   "by": "sonnet",
   "checked": 16,
   "corrected": 9,
   "notes": "Zoning quote and 'no zoning' statement confirmed on the county Building Codes and Zoning page and in the 2026 and 2022 letters. Newest letter (Jan 1, 2026) now cited; it lists County Engineering 281-633-7500, West Fort Bend Management District 281-344-1701. Removed unconfirmed 5,000-trip traffic study claim and the claim that Commissioners Court decides plats. Moved fee, inspection and address-letter citations to the pages that state them. Pages were read through fetch tools that return condensed text, so only short quotes already seen are kept."
  }
 },
 "fees": null,
 "note": "Summary of the public zoning code with links to each source. Not legal advice; confirm with the planning office."
}