 "jurisdiction": "Conroe, TX",
 "state": "TX",
 "counties": [
  "Montgomery"
 ],
 "url": "https://ruralvacantland.com/zoning/tx/conroe/",
 "publisher": "Rural Vacant Land (ruralvacantland.com)",
 "use": "drive-thru restaurant",
 "last_read": "2026-11-22",
 "summary": "We have not confirmed any zoning district in Conroe, TX where a drive-thru restaurant is allowed by right. 1 district is not confirmed yet.",
 "status_meaning": {
  "by_right": "Allowed by right",
  "conditional": "Needs a conditional or special use approval",
  "prohibited": "Not allowed",
  "unclear": "Not confirmed yet"
 },
 "zoning_layer": {
  "url": "",
  "district_field": ""
 },
 "districts": [
  {
   "district": "NO ZONING",
   "name": "No zoning ordinance in this jurisdiction",
   "status": "unclear",
   "quote": "",
   "code_section": "Development Guide, Section 1.0",
   "conditions": "",
   "source_url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf",
   "read_on": "2026-11-22"
  }
 ],
 "profile": {
  "official_name": "City of Conroe, Texas",
  "code_title": "",
  "code_last_amended": "",
  "zoning_map_url": "",
  "planning_office": {
   "name": "City Planner, City of Conroe",
   "phone": "(936) 522-3608",
   "url": "http://www.cityofconroe.org/services/community_development/planning/land_use_area_plans.php"
  },
  "drive_thru_summary": "The City of Conroe says it has no zoning ordinance, so no zoning district decides whether a drive-thru restaurant is allowed. A commercial project inside the city goes through site plan review (Engineering), a Development Permit, then a building permit and certificate of occupancy. The city's Development Guide (November 2011) does not address drive-thru standards.",
  "drive_thru_stacking": "Not addressed in the sources read.",
  "parking_restaurant": "Not addressed in the sources read. Confirm with the Engineering Department.",
  "signs": "Not addressed in the sources read.",
  "typical_timeline": "Site plan review about 10 to 15 working days and commercial building permit about 10 business days, both per the 2011 Development Guide and not confirmed as current. A plat or traffic study adds time.",
  "approvals": [
   {
    "type": "Site plan review",
    "who_decides": "City of Conroe Engineering Department (Development Division)",
    "steps": "Submit the site plan application, civil plans, landscaping, screening/buffering, supporting documents and fees (the guide says to the Central Receiving Office at City Hall; the city now uses the OpenGov online portal for engineering and development permits since December 8, 2025). Engineering reviews infrastructure, drainage, landscaping, environmental and safety items; extra studies or outside permits may be required.",
    "typical_time": "10 to 15 working days (2011 guide)",
    "fee": "Commercial plan review fee due at submittal, calculated with the city's Plan Review Calculator; a progressive fee applies after the third review submittal. No dollar amounts are stated.",
    "section": "Development Guide, Section 5.0",
    "source_url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf"
   },
   {
    "type": "Development permit",
    "who_decides": "City of Conroe (Engineering)",
    "steps": "Required for commercial site development inside city limits; issued after subdivision compliance and site plan approval, and allows site construction before a building permit. Pre-construction meetings are required for publicly maintained improvements and recommended otherwise.",
    "typical_time": "Not stated",
    "fee": "No amount stated; the city refers to its fee schedule and a Plan Submittal Fee Calculator.",
    "section": "Development Guide, Section 6.0",
    "source_url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf"
   },
   {
    "type": "Subdivision plat (if land is not already platted)",
    "who_decides": "Planning Commission; plat recorded in Montgomery County Official Public Records",
    "steps": "Pre-development meeting, land study, conditional Planning Commission approval of the preliminary plat, site plan review, final plat package (development agreement with financial guarantee inside city limits unless improvements exist), final Planning Commission approval and certification, Certificate of Compliance, recording.",
    "typical_time": "Not stated. Planning Commission meets the 1st and 3rd Thursdays; submittals are due 10 days before a meeting.",
    "fee": "Not stated",
    "section": "Development Guide, Section 4.0",
    "source_url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf"
   },
   {
    "type": "Building permit and certificate of occupancy",
    "who_decides": "City Permit Department (Building Official); Fire Marshal reviews concurrently",
    "steps": "Submit the approved site plan set, Commercial Building Permit Application and building plans; the city replies with comments, requirements or approval; inspections follow.",
    "typical_time": "About 10 business days for commercial (2011 guide)",
    "fee": "Not stated",
    "section": "Development Guide, Section 6.0",
    "source_url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf"
   }
  ],
  "districts": {},
  "overlays": [
   {
    "name": "Downtown Conroe Development Plan",
    "effect": "A city plan for downtown, linked from the city website. It was not read, so its effect on drive-thru uses is unknown.",
    "source_url": "https://www.cityofconroe.org/services/community_development/index.php"
   }
  ],
  "sources": [
   {
    "title": "City of Conroe Development Guide (revision dated November 2011)",
    "url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Engineering/Development%20Guide.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "City of Conroe annexation FAQ brochure (undated; 2019 annexation heading)",
    "url": "https://cms3.revize.com/revize/conroetx/Documents/Services/Community%20Development/Planning/Annexation/050819%20Website%20Brochure%2020.pdf",
    "read_on": "2026-11-22"
   },
   {
    "title": "City Planner land use and area plans page",
    "url": "http://www.cityofconroe.org/services/community_development/planning/land_use_area_plans.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Building Inspections and Permits FAQs",
    "url": "https://www.cityofconroe.org/services/building_inspections_permits/faqs.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Engineering Department page",
    "url": "https://www.cityofconroe.org/services/engineering/index.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Site Development page",
    "url": "https://www.cityofconroe.org/services/engineering/site_development/main.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Development Plans page",
    "url": "https://www.cityofconroe.org/services/engineering/site_development/development_plans/main.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Land Planning page",
    "url": "https://www.cityofconroe.org/services/engineering/land_planning/main.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Planning Commission page",
    "url": "https://www.cityofconroe.org/government/boards_commissions/planning_commission/index.php",
    "read_on": "2026-11-22"
   },
   {
    "title": "Municipal Development (Community Development) page",
    "url": "https://www.cityofconroe.org/services/community_development/index.php",
    "read_on": "2026-11-22"
   }
  ],
  "verified": {
   "on": "2026-11-22",
   "by": "sonnet",
   "checked": 10,
   "corrected": 7,
   "notes": "The quote is word for word in the 2011 Development Guide, Section 1.0. The 2019 brochure words it differently (\"nor do we have a formal zoning ordinance\"). Newest confirmation: the city's Building Inspections and Permits FAQ says \"No, the City of Conroe does not have zoning at this time\"; the page carries a 2026 copyright and links dated up to May 2026 but shows no page date, so treat it as current to 2026. The City Planner page also says \"does not have a Zoning Ordinance\" (undated, 2026 footer). Phone: the planner office is (936) 522-3608 on the city's current land use page; the 2011 guide's (936) 522-3098 is stale. Other lines: Engineering (936) 522-3100, Director of Municipal Development (936) 522-3600, main (936) 522-3000. Corrections: removed unsupported Chapter 94 reference, a third-party code-host mention, 'Building Inspections & Permits' decision-maker, and the homepage source (not reopened); replaced planning phone; added commercial permit time, plan-review fee wording, plat meeting schedule, clearing permit, ETJ and OpenGov facts; corrected plat section to 4.0. Fee amounts and the 10 to 15 day review time were not found on current pages (the 10 to 15 days is 2011 only). The Downtown plan and 2040 Comprehensive Plan were not read. Pages were read via a summarizing fetch tool, so quotes outside the district row are paraphrase-checked only."
  }
 },
 "fees": null,
 "note": "Summary of the public zoning code with links to each source. Not legal advice; confirm with the planning office."
}