{
 "jurisdiction": "Collin County (unincorporated), TX",
 "state": "TX",
 "counties": [
  "Collin"
 ],
 "url": "https://ruralvacantland.com/zoning/tx/collin-county/",
 "publisher": "Rural Vacant Land (ruralvacantland.com)",
 "use": "drive-thru restaurant",
 "last_read": "2026-11-28",
 "summary": "A drive-thru restaurant is allowed by right (no conditional use permit, special exception or rezoning) in these zoning districts: NONE.",
 "status_meaning": {
  "by_right": "Allowed by right",
  "conditional": "Needs a conditional or special use approval",
  "prohibited": "Not allowed",
  "unclear": "Not confirmed yet"
 },
 "zoning_layer": {
  "url": null,
  "district_field": null
 },
 "districts": [
  {
   "district": "NONE",
   "name": "No county zoning (unincorporated area)",
   "status": "by_right",
   "quote": "If your property is located in the unincorporated area of Collin County, there is no zoning.",
   "code_section": "Collin County Engineering FAQ, zoning section; Development Services FAQ, zoning section",
   "conditions": "The Development Services FAQ says the county has no zoning restrictions in the unincorporated areas, except for sexually-oriented businesses, salvage and junk yards, and animal slaughter operations. Restaurants and drive-thrus are not among the exceptions. Permits are still required for any project that disturbs ground or adds footprint. Commercial permits go through the Fire Marshal's Office. Sites outside city limits need an On-Site Sewage Facility (OSSF) permit. Driveway, culvert and right-of-way work is handled by Public Works. Platting may be required when subdividing; the county Engineering Department is the platting authority only outside a city's ETJ. Structures are not allowed within drainage easements. If a parcel is inside a city or its ETJ, city rules can apply.",
   "source_url": "https://www.collincountytx.gov/services/engineering/development-services/faq",
   "read_on": "2026-11-28"
  }
 ],
 "profile": {
  "official_name": "Collin County, Texas (unincorporated areas)",
  "planning_office": {
   "name": "Collin County Development Services / Engineering",
   "url": "https://www.collincountytx.gov/services/engineering/development-services/faq"
  },
  "drive_thru_summary": "Unincorporated Collin County has no zoning, so a restaurant with a drive-thru is not restricted by a use district. The county's only listed use restrictions are on sexually-oriented businesses, salvage and junk yards, and animal slaughter. A project still needs county permits (building/development, Fire Marshal for commercial, OSSF if no sewer, driveway/culvert) and may need platting.",
  "typical_timeline": "Per the Development Services FAQ: 2-4 business days for intake and invoicing, then up to about 30 days of permit review after fees are paid. The OSSF suitability review for plats can take up to 45 days under state law. Commercial permits expire after 180 days of no activity, and OSSF permits after 365 days.",
  "approvals": [
   {
    "type": "Building / development permit (ground disturbance or added footprint)",
    "who_decides": "Collin County Development Services; commercial permits go through the Fire Marshal's Office",
    "steps": "Apply through the county customer service portal. Fees are invoiced and must be paid before review starts.",
    "typical_time": "2-4 business days intake, then up to 30 days review",
    "section": "Development Services FAQ",
    "source_url": "https://www.collincountytx.gov/services/engineering/development-services/faq"
   },
   {
    "type": "On-Site Sewage Facility (OSSF) permit",
    "who_decides": "Collin County Development Services",
    "steps": "Required when the property is outside city limits.",
    "section": "Development Services FAQ",
    "source_url": "https://www.collincountytx.gov/services/engineering/development-services/faq"
   },
   {
    "type": "Driveway / culvert / right-of-way",
    "who_decides": "Collin County Public Works",
    "steps": "Contact Public Works for inspections. The Engineering FAQ also lists driveway/culvert permits.",
    "section": "Development Services FAQ; Engineering FAQ",
    "source_url": "https://www.collincountytx.gov/services/engineering/FAQ"
   },
   {
    "type": "Plat",
    "who_decides": "County Engineering Department, only for land outside a city's ETJ",
    "steps": "Subdividing may require a plat. The plat needs an OSSF suitability subdivision review by Development Services.",
    "typical_time": "OSSF plat review up to 45 days under state law",
    "section": "Development Services FAQ; Engineering FAQ",
    "source_url": "https://www.collincountytx.gov/services/engineering/development-services/faq"
   }
  ],
  "sources": [
   {
    "title": "Collin County Engineering FAQ",
    "url": "https://www.collincountytx.gov/services/engineering/FAQ",
    "read_on": "2026-11-28"
   },
   {
    "title": "Collin County Development Services FAQ",
    "url": "https://www.collincountytx.gov/services/engineering/development-services/faq",
    "read_on": "2026-11-28"
   },
   {
    "title": "Tex. Local Gov't Code 231.073 and 231.075",
    "url": "https://texas.public.law/statutes/tex._local_gov't_code_section_231.073",
    "read_on": "2026-11-28"
   }
  ],
  "verified": {
   "on": "2026-11-28",
   "by": "sonnet",
   "checked": 9,
   "corrected": 5,
   "notes": "The no-zoning sentence is confirmed word for word on the Engineering FAQ; the Development Services FAQ confirms it in other words and lists the three excepted uses. Permit timelines added; fees are not stated on the pages. Lake zoning under Local Gov't Code ch. 231: the subchapters read name other counties and lakes, not Collin County or Lake Lavon; read from non-official copies of the statute, so later amendments are not ruled out. Airport zoning was not researched. Overlays left empty means not checked, not that none exist."
  }
 },
 "fees": null,
 "note": "Summary of the public zoning code with links to each source. Not legal advice; confirm with the planning office."
}